Production Update – Assembly 1

Deck moved to our Seawind shed on 6th October for the first Assembly stage. Work is being carried out on transom extension. Hull is in our driveway waiting for some Lam parts to be handed over. Deck joining is scheduled for 20th October, 2020.

Production Update – Fit out

Your boat is progressing well in the Fit out stage.

We have recently done with the mast base, deck gear, trampoline, Lewmar hatches, davits, sliding door, fridge and freezer installed (waiting for bench top completion) and washing machine.

Our Production team is currently working on plumbing work (90% done), electric work (75%), timber fitout at 50%.

Production Update – Lamination

An exciting journey has started. Your boat is making progress in the Lamination stage.

The hull was finished and has just been moved to Assembly 1 stage. The deck was demolded and Lamination team is working on the dry fit. The coach roof of the boat is also ready in the mold.

Production Update – Assembly

Your boat is progressing well in the Assembly stage.

We recently have completed pulpit, longeron, and first stage of plumbing (thru-hulls, main hoses).
Our Production team is currently working on deck gear including winches, chainplates, Laminex bulkheads, window liners and hull windows.

Production Update – Fit out

It is exciting that your boat is taking the first step in the Fit out stage.

We have recently installed engines, fwd beam and trampolines, and solar panels.
Our Production team is currently working on hull and salon windows, forward opening windows, electric installation (25% done), and plumbing work (50%).

Production Update – Fit out

We are excited to inform you that your boat has been moved to the Fit out stage.

We have recently installed all windows, engines, solar panels, composite deck hatches, fwd beam and trampoline.
Our Production team is currently working on remaining deck gear, electric works (50% done), plumbing 75%, and antifouling preparation. Timber fitout has started.