Production Update – Detailing & QA

The boat is now at the driveway of the potential final stage.

At this point, we are still waiting for the electric propulsion parts so the electric installations are temporarily stalled.

In the next two weeks, when the electric propulsion parts and genset arrive, we will install them and let the boat go through the remaining steps to be completed.