Your boat has been progressing well in the assembly stage.
The deck joining took place on June 12th. At this point, we have done some parts including the Hardtop-on process, engine pods, tanks installation, flowcoat works, toilet bases installation, and stanchions.
We’re now working on deck gear, trampoline flange, and deck drainage system.