Production Update – Lamination

An exciting journey has started. Your boat is making progress in the first stage of production – Lamination.

Up to this point, the side hull and centre hull are already joined. The furniture of the forward cabins and the forward head has been assembled and glassed. Plus, our team has got the omegas glassed as well.

As you can see in the photo, all bulkheads have been manufactured and glassed in their correct locations. According to our team, we plan to place the fuel tanks in their locations and get this job completed within this week. Regarding the centre furniture, at this point, both port head and starboard aft cabin furniture have also been trimmed and we’re going to put them in their locations after some preparations.