Production Update – Fit out

Your boat has been progressing well in the fit out stage.
There are some jobs done on the boat like galley timber fitout, windlass, trampoline, interior flooring, all deck gear, composite deck hatches.
Our Production Team is currently working on: synthetic lifelines, electric works (75% done), cabin timber fitout (75%), plumbing (50%), setting up nav station.