Your boat has been moved to the new stage – fitting out.
The engines have been installed and some other main tasks have also been done such as rudders, all thru-hulls, laminate bulkheads, and Lewmar deck hatch frames.
Currently, we’re working on antifoul preparation, deck gear (30% done), and hardtop windows.