Your boat has been moved to the new stage – Fitting out.
The boat has recently been equipped with some components that make significant progress. At this stage, the longeron and all interior window liners have been assembled. All exterior surface preparations are ongoing for gel coat repairs, and we’re also working on the steering system installation.
We’re now doing some preparations for the plumbing and electric system.