Production Update – Fitout

Your boat is now in the fit-out stage where we have started to work on the key parts and the preparations for windows in.

At this point, the deck joining took place on March 16th. Then, we’ve done some main jobs related to furniture assembly, window liners, deck-hull exterior joints and surface preparation of the joints. Besides, the exhaust system, engine seawater filters and hose, rudder shaft with rudders and engines have also been installed.

At present, our production is working on all the interior laminations of the deck.