Your boat is now at the driveway of the final stage.
Recently, we have completed all the tasks related to saloon flooring, throttle control, all deck gear, all solar panels, mast base, galley benchtop, watermaker, antifouling, all plumbing, and steering.
We’re now working on electric system (75% done), and timber fitout (25% done).