Your boat has already entered the new stage after assembly – fitting out.
At this point, we have installed the steering system, all solar panels, all deck gear, flooring and windows. Our team has also done their job on plumbing and antifouling.
Currently, we’re working on electric works (50% done), forward bunk headliners, and trifold doors.