Your boat has already entered the new stage after lamination – assembly.
At this ASSY-1 stage, the targa bar, roof and stanchions have been installed.
Currently, we’re doing final preparation for deck joining and painting the blacks.
Your boat has already entered the new stage after lamination – assembly.
At this ASSY-1 stage, the targa bar, roof and stanchions have been installed.
Currently, we’re doing final preparation for deck joining and painting the blacks.