Your boat is now in the fit-out stage where we have started to work on the key parts and the preparations before the boat goes to the QA & Detailing stage.
At this point, we’ve done some main jobs related to antifouling, forward beam, railing and lifelines, rudders installation, salon and forward opening windows, deck gear, helm seats, BBQ, galley bench tops.
We’re now working on composite deck hatches, steering, plumbing (75% done), electrical works (35%), and solar panel bracket.