We are currently advancing through the Detailing & QA stage of your SW1160 Lite.
Recent works that have been completed on the boat include the installation of forward opening windows, application of antifouling, fitting of the trifold door, and completion of all solar panel installations, interior flooring, and plumbing.
At present, we are focusing on electric installation, which is 90% complete, and the timber fitout, which is 75% finished. Additionally, we are working on installing the fridge/freezer and stove, preparing for the Flexiteek installation, and addressing various detailing tasks to ensure everything meets our quality standards.