Timber furniture is getting ready so they can be installed at fitout 2 stage
Cockpit gelcoat detailing work is now done, flooring is sanded ready for flexiteak. Cockpit hardware installation is underway.
Forward deck flooring is also sanded ready for flexiteak installation. Deck hatches are detailing.
Saloon: Galley kick base is 50% completed. Saloon floor is sanded and faired ready for flooring is installed.
Cabins: Windows liner are being installed. Bed bases are installed.
Gelocat detailing work for both bathroom is underway
Longeron is being joined today
View from the bow and the stern