Production Update – Fitout

Your boat has been progressing well in the Fit-out stage and was recently equipped with some critical components.

At this stage, we have already installed the forward beam, A-frame, anchor box, windows and trampoline. We are now working on the deck hardware (95%), steering system (25%), plumbing & LPG (50%), electrical system (15%), and timber fitout (50%).