Production Update – Fitout

Your boat has been progressing well in the Fit-out stage and was recently equipped with some critical components.

At this stage, our Team has completed the ventilation system, fuel system and the bilge system. In the meantime, the seawater and black water systems have also been completed.

We are now working on the freshwater system (80%), all timberwork installation (75%), and the electrical system (60%).