Production Update – Assembly

We are excited to inform you that your boat has been moved to the Assembly stage.

The hull was successfully demolded, and our Lamination team is currently proceeding with the installation of the furniture modules inside the hull. At the same time, the deck and coach roof are being fabricated in their respective molds. With the current progress, the hull-to-deck joining is expected to take place soon.