Your boat is doing well on schedule in the second phase of fitting out.
We have done with all Lewmar hatches installation, lifelines, antifoul preparation, deck gear, fwd opening windows, trifold door installation, steering, carpet works and all interior floors.
Currently, we are working on plumbing (80%), electric installations (60%) and timberworks.