Your boat is now in the Fit-out stage, where we have started to work on the key parts and the preparations for windows in.
At this point, the engines have already been installed, and we are now working on the galley-up arrangement, window liners in preparation for window installation, and deck hardware installation. Work on the steering system, plumbing, and electrical system is also ongoing.