Your boat has now moved to a new stage – fitting out.
At this stage, we have the rudders and steering system installed, Lewmar hatches in place, galley benchtops, and window liners. We have also had the BBQ fitted, all plumbing has been done, as well as forward opening windows installation.
Currently, we are 80% done with the deck gear and 30% done with electric installations. Helm seats have been installed, as well as the interior flooring.