Your boat has now entered the fit-out stage.
We have completed fitting the deck gear, flexible solar panels, all hardtop windows, all Lewmar hatches, and trampoline.
Currently, we are working on antifoul preparation, fuel tank installation, steering system, and daggerboard casing glassworks. At the same time, electric and plumbing systems are also being worked on (50% done).