Production Updates – Assembly

Your boat has been moved to the Seawind shed and progressing well at the assembly station.

We are detailing the painted surface of the hull, bow, and cockpit area, as well as trimming the edges for the window frames. We have already installed the stanchions. The lid for the deck hatches will be installed after we are done measuring the hatches’ dimensions. We have also started drilling holes through the hull to prepare for the through-hull fitting.