Production Update – Fit out

Your boat is progressing well in the new stage – Fit out.

Your boat has just been moved to our new facility last week where we are having the 1370 and 1600 lines built.

At this point, we have installed the stanchions. Currently, we are measuring the dimensions & profiles to prepare to install the hatch lid. We have also started drilling holes through the hull in preparation for the through hull fitting. The window frames have also been trimmed to the correct profile to prepare for glazing.