We have made quite some progress after the boat was settled in the new facility.
At this point, all deck gear has been installed as well as hand railing and fuel/holding tanks. We have also installed dinghy belting strip, all port/starboard hull windows, deck port lights and Harken deck winches. The longeron has been assembled and pre-fitted. The cross beam and components have been painted, we will wait for the paint cures properly, then permanently install the cross beam and longeron.
All plumbing hosses have been run throughout the boat, plumbers will start to install all plumbing accessories shortly. We are now about to install the forward window and saloon side windows. The rudder gudgeon plates will also be installed this week.