There has been some progress since your boat entered the Assembly stage.
Currently, we are doing thru-hulls, deck gear installation, laminate bulkheads, plumbing (30% done), carpet works, rudder bearings and installing the mast base.
There has been some progress since your boat entered the Assembly stage.
Currently, we are doing thru-hulls, deck gear installation, laminate bulkheads, plumbing (30% done), carpet works, rudder bearings and installing the mast base.