Production Update – Fit out

It is exciting that your boat has been moved to Fit out stage.

We recently completed the cockpit winches, lifelines, and longeron installed.
Our Production team is currently working on windows installation, deck gear, fitting composite deck hatches, completing bunk bases, interior liners, first plumbing stage (25% done), fitting daggerboards.

Production Update – Fit out

Your boat is progressing well in the second phase of Fit out stage.

Recent jobs that we completed are all deck gear completed, hardtop installed, all deck hatches, helm pedestals, all windows, watermaker and engine installed.
Our Production Team is currently working on: electric works (50%), plumbing (90%), timber fitout (10%), and steering system (80%).

Production Update – Detailing & QA

Your boat is now at the driveway of the final stage.

Recently, we have completed all the tasks related to saloon flooring, throttle control, all deck gear, all solar panels, mast base, galley benchtop, watermaker, antifouling, all plumbing, and steering.

We’re now working on electric system (75% done), and timber fitout (25% done).

Production Update – Completion

We are excited to announce that Venturous is now completed and will be launched soon.

Please see below for some photos of the boat in her final days before being launched. Let us also take you on a tour around your boat via this Youtube video

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1370.

Production Update – Completion

We are excited to announce that Oculus is now completed and left our factory to the storage yard.

Please see below for some photos of the boat in her final days before being wrapped up . Let us also take you on a tour around your boat via this Youtube video.

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1260.

Production Update – Fit out

Your boat has been entering the Fitout 3 stage with a few more completed components.

Until now, the team has assembled the longeron and all interior window liners. Fresh water, seawater, grey water discharge pumps and bilge pumps have been installed. On the electrical part, the batteries, chargers, switch panel, and Czone installations have also been completed. The electrical assembly and wiring have just started.

The production team is currently working on the steering system, Targa bar, and trifold doors.

Production Update – Assembly

Your boat is progressing well in the Assembly stage.

We recently completed the window liners, galley base installed, and tanks installed.
Our Production team is currently working on bow joint gelcoat repairs, deck gear bases, floor inserts, and bunk bases.