SC610 – Production Update – Lamination

An exciting journey has started. Your boat is making progress in the first stage of production – lamination.

The deck was demolded and ready on the cradle. Its hull will be laminated soon in the next couple of weeks. After this stage is completed, the boat will be moved to Seawind shed for the assembly stage soon.

Production Update – Lamination

Your boat has made some significant progress in Lamination stage.

The hull was demolded a week ago and our Lamination Team is working on installing furniture lamination parts inside the hull. The deck will be laminated soon.

Production Update – Assembly

Your boat has made some progress in Assembly stage.

The boat was moved over to 1370 main production line. Our production team is preparing the interior to get the hull be ready for joining in the next couples of weeks. The gelcoat surface on the bottom of the boat is also being finished.

Production Update – Assembly

It is great that your boat has taken final steps in Assembly stage.

The hull and deck were joined two weeks ago. We are currently working on window liners, starboard aft cabin modifications, hull and trampoline flange gelcoat repairs and installing pulpits. With this progress, the boat will be moved to Fit out stage in the next couples of weeks.

Production Update – Fit out

It is great that your SC605 is taking first steps in Fit out stage.

Pulpits were installed on the boat. We are currently working on window liners and modifications of starboard aft cabin. Gelcoat repairs of hull and trampoline flanged are in progress.

Production Update – Fit out

It is great that your boat has some significant progress in Fit out stage.

The window liners were installed. Antifoul surface preparation and chainplates had been completed. We are now continuously working on targa joint gelcoat repairs, fuel tank installation and plumbing.

Production Update – Fit out

Your boat has made some significant progress in Fit out stage.

The windows were fully installed on the boat at this stage. The electric works are ongoing with 50% done, plumbing 75% completed and deck gear 50% done.

Production Update – Fit out

Your boat has made some significant progress in Fit out stage.

Our production team have been done with the steering system, all windows including helm windows, deck gear, and Lewmar hatches. We are currently working on electric works (75%), plumbing (75% done), helm window, galley raw fitout, timber bulkheads, bunk raw fitout, solar panels and headliner.

Production Update – Detailing & QA

It is so excited that your boat has reached the Detailing & QA stage.

We are currently working on cabins and saloon fitout with 50% done, electric and plumbing 75% completed. Navigation desk dashboard is about to be installed. Trifold door and deck nonskid repair have been done. Our 1370 team is waiting to have final timber fitout being provided to install. Upholstery was also completed.