Production Update – Fitout 1

Jobs have now been completed on rudder/steering system, all Lewmar hatches installation, deck gear, galley benchtop, window liners, fwd opening windows, and trampoline installation. We are working on antifoul preparation, settee backs, aircon, and plumbing. Electric works has just been started.

Production Update – Assembly 1

The boat has now progressed to her first Assembly stage. Deck was moved to our Seawind shed on 12th November, and first handover check was done on the same day. Hull is currently stored at our warehouse in Navioil port in order to keep our driveway free for the moving of the Seawind 1600. Hull is planned to be transported back to the Seawind shed on Monday morning on 23rd November for the deck joining to begin.

Production Update – Fitout 2

Jobs have been completed on all windows, plumbing, headliners, galley, aircon, deck gear, and Flexiteak. We are currently working on door frames, joinery, electric installations (50% completed). Some critical parts will soon arrive for installation such as Mastervolt parts, hydro-generator parts and life raft.

Production Update – Assembly 2

This is a Seawind 1190 Lite which means she has a Seawind 1160 targa bar, interior and rigging. Deck joining took place as planned on 23rd November, 2020. We have just started with Assembly 2 works including carpet, trimming deck hatches, and trampoline installation. Boat is on time.

Production Update – Fitout 1

This is the first Seawind 1190 Sport with Inboard engines. Jobs have been completed on the helm seats, all Lewmar hatches installation, carpet, fwd opening windows, anchor, trampoline, and bulkhead Laminex. We are currently working on steering, deck gear, helm windows, starting plumbing and electrics.