The installation of all Lewmar hatches, trampoline, fwd opening windows, galley benchtops, bulkheads Laminex, and window liners is 100% completed. We are currently installing deck gear, hartop nonskid repair, bunk headliner surround, steering, electric (75% done), and just started with the plumbing work. Inboard engines will soon be installed.
Production Update – Assembly 2
Engines were able to be installed before deck joining. Trampoline and anchor roller assembly had been done. Currently working on window liners, Lewmar deck hatches, helm storage and ice box. The boat is on schedule.
Production Update – Fitout 2
Jobs have been completed on steering, deck gear, helm seats, Lewmar hatches, plumbing, helm windows, fwd opening windows, and benchtops. We are currently doing antifoul touch up, bunk headliners, and trifold door assembly. Electric works is about to be started.
Production Update – Lamination
Hull is planned to bring over to our Seawind shed on 16th Oct after Lamination work is completed. Deck is ready and currently sitting in front of main office waiting to be moved to our Seawind shed for the joining to begin.
Production Update – Fitout
Production Update – Fitout 2
Production Update – Fitout 2
Tremendous progress has been achieved in the past month.
Interior: all tanks installation has been completed. Kitchen is almost done with all shelves, bench top, utilities installed. Electrical panel and Navigation desk are 100% done. Bed bases are completed including interior furniture. We are working on final detailing of bathrooms and running of electrical wiring.
Exterior: we have made quite a progress with the completion of starboard hull detailing, cockpit detailing, through holes and life raft access.
Engineering: watermaker supports, holding tanks, water tanks, fuel tanks, pre-fit stanchions, and galley kick are now completed.