Most of the major works are now done. We are starting with detailing jobs such as doing silicone wipes. Saloon headliner is being sanded and sprayed.
Congratulations – August Dreamer is on her way!
Your Seawind 1260 has been completed, and is all wrapped up. A quick tour of the boat can be viewed via this Youtube video.
It has been a pleasure building this boat for you and on behalf of the entire team at Seawind Catamarans we wish you many years of fun filled enjoyment aboard your new Seawind 1260.
Fair winds and following seas,
Production Update – Fitout 2
Congratulations – Jakdec is on her way!
Your Seawind 1160 Lite has been completed, and is on her way to Brisbane. The boat is scheduled to arrive at Brisbane on 17th November, 2020. A quick tour of the boat can be viewed via this Youtube video.
It has been a pleasure building this boat for you and on behalf of the entire team at Seawind Catamarans we wish you many years of fun filled enjoyment aboard your new Seawind 1160 Lite.
Fair winds and following seas,
Production Update – Assembly 2
Assembly stage is ongoing with its second phase.
Exterior: helm stations have been pre-fitted and coated with primer. Hull detailing has now been completed. Works are done with chain plates detailing, inboard bow section.
Interior: works have been completed for the installation of fwd fresh water pump, holding tank, and the moldings of escape hatches. Starboard head detailing, hot & cold plumbing, and window liners are 90% done. The preparation of window installation is half way ready. Other jobs including bed base and settee back have been started.
Engineering: water maker mounts, battery box, muffler mounts are all installed.
Production Update – Lamination
Production Update – Fitout 2
Production Update – Lamination
Production Update – Lamination
Production Update – Fitout 1
The installation of all Lewmar hatches, trampoline, fwd opening windows, galley benchtops, bulkheads Laminex, and window liners is 100% completed. We are currently installing deck gear, hartop nonskid repair, bunk headliner surround, steering, electric (75% done), and just started with the plumbing work. Inboard engines will soon be installed.