Production Update – Fit out

Your boat is progressing well in the Fit out stage.

We have recently done the engine room fitout, trampolines, forward beam, all solar panels, remaining steering installation, and all deck gear.
Our Production team is currently working on plumbing (75% done), the first phase of electric work (75% done), timber fitout (50%), aircons, and antifouling preparation.

Production Update – Assembly

Your boat is progressing well in the last phase of Assembly stage.

Deck joining internal glass work was completed.

Our Production team is currently working on salon windows cutouts, hull windows, push and pulpits, installing AC units, applying Laminex bulkhead panels. The first stage of plumbing work is ongoing.

Production Update – Fit out

We are excited to inform you that your boat has been moved to the Fit out stage.

Engines are installed, aircon units in place, solar panels applied, and all fixed windows have been done.
Our Production team is currently working on anchor system, wall and headliners, electric installation (25% done), plumbing (50%), rudder installation, and deck gear (50%).

Production Update – Fit out

It is exciting that your boat has been moved to Fit out stage.

We have recently done all windows including electric helm windows, solar installation, and forward beam with trampoline.
Our Production team is currently working on deck gear (75% done), remaining steering work, electric installation (50%), timber fitout (30%), plumbing (75%), composite hatches, and remaining engine room fitout.

Production Update – Fit out

Your boat is progressing well in the Fit out stage.

We recently have done the helm seats, solar panel installation, and engine room fitout.
Our Production team is currently working on deck gear (90% done), remaining steering work, plumbing (75%), electric (75%), timber fitout (75%), and headliners.

Production Update – Fit out

Your boat is progressing well in the last phase of Fit out stage.

We recently completed the galley bench top, Lewmar hatches, fridge & freezers, and plumbing.
Our Production Team is currently working on electric works (90% done), antifouling, timber fitout (75%), interior flooring, helm console fitout, and detailing.