Congratulations – Jakdec is on her way!

Your Seawind 1160 Lite has been completed, and is on her way to Brisbane. The boat is scheduled to arrive at Brisbane on 17th November, 2020. A quick tour of the boat can be viewed via this Youtube video.

It has been a pleasure building this boat for you and on behalf of the entire team at Seawind Catamarans we wish you many years of fun filled enjoyment aboard your new Seawind 1160 Lite.

Fair winds and following seas,

Production Update – Fitout 2

The boat has now entered her second Fitout stage. Works have been completed on antifoul, Sado glass installation, fwd opening windows & helm windows installation, deck gear, steering, and flooring. We are currently working on electric, plumbing, galley benchtops installations. Detailing has been started in some areas. The boat building progress is right on schedule.

Production Update – Fitout

This boat is a 4-cabin with inboard engines. Works have been completed on the trampoline, anchor roller assembly, deck hatches, helm seat, laminate bulkheads and interior flooring. We are now working on thru-hulls, deck gear, plumbing, and electric. Steering is 50% done. Boat is currently on schedule.

Production Update – Assembly 2

The boat has ben progressed smoothly into her second Assembly stage. This boat is a 4-cabin with inboard engines. Deck joining took place on schedule on 15th June. We are currently working on trampoline ferrules, deck hatches trimming (Lam), and starting on carpet works.