Production Update – Fit out 2

Your boat is now in stage 2 of fitting out. It has been a special journey since this is our first Seawind 1190 Sport with inboard engines. Until now, the completed works include all hatches and windows, synthetic lifelines, electric installations, inboard engines and diesel water heater. Currently, we are starting the final phase: doing detailing, starting to test systems, and working on rudder casings.

Production Update – Fitout 2

We have completed the work with antifoul preparation, anchor system, sado glass on hardtop, helm seats, deck gear, all composite hatches, floors, and fwd opening windows. Daggerboards casings are also installed.
Currently, we are working on window liners midship, and galley benchtops. We are 50% done with plumbing, 75% done with electricity and started detailing works.

Production Update – Fitout 1

This is the first Seawind 1190 Sport with Inboard engines. Jobs have been completed on the helm seats, all Lewmar hatches installation, carpet, fwd opening windows, anchor, trampoline, and bulkhead Laminex. We are currently working on steering, deck gear, helm windows, starting plumbing and electrics.

Production Update – Assembly 1

This is our first SW1190 SPORT with Inboard engines. Deck was been moved over to SW shed and handed over at 29th August. Hull was moved over on 1st September, 2020. Targa bar and roof have been installed. Transom extension works are about to start. We plan to start the deck joining process around 10th September. Engines are planned to arrive at our factory this week.

Production Update – Lamination

The boat is in her Lamination stage with hull has already been demolded. Deck is now in IGU stage, which has been started since the beginning of this week, and will be ready for installing Main Furniture on next Monday 10th August, 2020.