Production Update – Completion

We are excited to announce that Eora is now completed and left our factory to the port for sea trial.

Please see below for some photos of the boat before being launched. Let us also take you on a tour around your boat via thisĀ Youtube video.

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1370.

Production Update – Details & QA

Your boat is now in Details & QA stage.

We have done all windows and hatches, BBQ, Aircon systems, deck gear, trampolines, interior flooring, salon headliner, galley fitout, and helm window.
Our Production Team is currently working on the nav desk console, remaining engine room installations, and timber fitout (75%).

Production Update – Fit out

Your boat is taking final steps in the Fit out stage.

We have completed all windows and hatches, BBQ, Aircon systems, deck gear, and trampolines
Our Production Team is working on the electric system (80% done), engine room installations, timber fitout (30%), wall and ceiling interior liners.

Production Update – Fit out

Your boat has made some progress in Fit out Stage.

We have done with all windows and hatches, BBQ, aircon systems, deck gear, and trampolines.
Our team is currently working on the electric system (75% done), wall liners, headliners, plumbing (75% done). Timber fitout preparation is being processed.

Production Update – Fit out

Your boat has made some significant progress in Fit out stage.

The windows were fully installed on the boat at this stage. The electric works are ongoing with 50% done, plumbing 75% completed and deck gear 50% done.

Production Update – Fit out

Your boat has made some significant progress in Fit out stage.

Our production team is working on electric cabling, forward opening windows installations, and trampoline flange. Deck gear and composite deck hatches are also being installed step by step.

Production Update ā€“ Fit out

Your boat is progressing well in the first phase of fitting out.

At this point, the Targe bar had just been fitted and the engines are installed. We are working on deck joining and a few engines were planned to arrive on 15th of March.

Production Update – Assembly

Your boat is now moving on to a new stage ā€“ Assembly.

As you will see, the coach roof now has window surround attached and both salon and cockpit ceiling grids installed. Besides that, The Targa bar was handed over to the assembly team and we are preparing it for joining and installation to the boat.

After TET we will install the Targa bar and coach roof to the main deck and then join the deck to the hull.