Production Update – Details & QA

Your boat is taking the first steps in Details & QA stage.

We have all windows installed, steering, helm consoles, solar panels, fwd beam installed. All deck gear, helm windows, helm seats, steering, galley fitout, BBQ, salon headliners, plumbing were also finished.

Our Production Team is currently working on electric system near final stage, timber fitout (75% done), companion way flooring.

Production Update – Fit out

Your boat is taking the final steps in Fit out stage.

We have all windows installed, and completed the steering, helm consoles, solar panels, fwd beam installed, composite deck hatches, all deck gear, helm windows, trampoline.
Our Production Team is currently working on the electric system (almost near the final stage), plumbing 75%, timber fitout (50% done), windlass installation, completing wall and ceiling interior liners.

Production Update – Fit out

Your boat is progressed well in the Fit out Stage.
We have all window installed. Our Production Team is currently working on electric system (75% done), plumbing (50%), deck gear (60%), solar panel recesses, wall and ceiling interior liners, windows installation, and timber fitout preparation.

Production Update – Fit out

Your boat has made some progress in Fit out stage.
We have done the with the antifouling and all windows installed.
Our production team is currently working on rudder installation, plumbing, engine room installations, electric system (50% done), deck gear (50% done).

Production Update – Fit out

It is great that your boat has some significant progress in Fit out stage.

The window liners were installed. Antifoul surface preparation and chainplates had been completed. We are now continuously working on targa joint gelcoat repairs, fuel tank installation and plumbing.

Production Update – Fit out

It is great that your boat has moved to Fit out stage.

After the joining on the last week of March, the window liners were installed on the boat. Currently our team is working on targa liner installation, cable conduits and starting with deck gear. The engine room is being prepared so that the engines can be installed soon.

Production Update – Assembly

Your boat has been progressing well in the assembly stage

As you can see, the window liners are installed. We are now having the plan for the deck joining and window installation. Currently, the engines and other parts are available for the next steps.

Production Update – Assembly

Your boat is now moving on to a new stage – Assembly.

At this point, engines are installed. The main deck has trifold door bulkhead installed with the helm seat and console. As per our plan, the coach roof assembly will be started after TET.