Production Update – Details & QA

Your boat is now in Details & QA stage.

We have done all windows and hatches, BBQ, Aircon systems, deck gear, trampolines, interior flooring, salon headliner, galley fitout, and helm window.
Our Production Team is currently working on the nav desk console, remaining engine room installations, and timber fitout (75%).

Production update – Completion

We are excited to announce that Champagne Sailing 2 is now completed and left our factory to the storage yard.

Please see below for some photos of the boat in her final days before being wrapped up. Let us also take you on a tour around your boat via this Youtube video.

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1160 Resort.

Production update – Completion

We are excited to announce that Solid Air is now completed and left our factory to the storage yard.

Please see below for some photos of the boat in her final days before being wrapped up. Let us also take you on a tour around your boat via this Youtube video.

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1260.

Production update – Completion

We are excited to announce that Towan is now completed and left our factory to the storage yard.

Please see below for some photos of the boat in her final days before being wrapped up. Let us also take you on a tour around your boat via this Youtube video.

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1160 Lite.

Production Update – Completion

We are excited to announce that Dalliance is now completed and going to leave our factory for the sea trial.

Please see below for some photos of the boat before being launched. Let us also take you on a tour around your boat via this Youtube video.

It has been a pleasure building your boat and on behalf of the entire team at Seawind Catamarans, we wish you many years of fun-filled enjoyment aboard your new Seawind 1260.

Production Update – Detailing & QA

Your boat has been going well in the final steps of the Detailing & QA stage.

Since the last update, there are a few parts on the boat that have been recently completed such as all deck gear, A-frame, antifouling, and centre console.

Currently, we’re working on the electric system (50% done), plumbing (50%), and mast compression post.

Production Update – Detailing & QA

Your boat has been progressing well in the final steps of the Detailing & QA stage before it’s completely done.

At this point, the Gori propellers have been installed. Besides, we have also done a few more parts including antifouling, heading system, and solar panels.

Currently, we’re working on electric system (50% done), steering (75%), and interior flooring.

Production Update – Assembly

It is exciting that your boat has been moved to Assembly stage.
We have done the jobs on detailing of the hull. Our Production Team is working on transom hull-deck join glassing, glassing the salon door frame, and nonskid repairs.

Production Update – Assembly

Your boat is taking final steps in the Assembly stage.
We have completed the carbon chainplates, galley base, window composite liners, black paint stb hull, splashboards at inner hulls, and some tanks installed.
Our Production Team is working on the black paint of port hulls, flowcoat works, making the interior floor insert, and continuing with deck gear.