Production Update – Assembly 2

Assembly stage is ongoing with its second phase.

Exterior: helm stations have been pre-fitted and coated with primer. Hull detailing has now been completed. Works are done with chain plates detailing, inboard bow section.

Interior: works have been completed for the installation of fwd fresh water pump, holding tank, and the moldings of escape hatches. Starboard head detailing, hot & cold plumbing, and window liners are 90% done. The preparation of window installation is half way ready. Other jobs including bed base and settee back have been started.

Engineering: water maker mounts, battery box, muffler mounts are all installed.

Production Update – Fitout 2

Many jobs have now been completed including the installation of trampolines, lifelines, Lewmar hatches, helm seats, galley benchtops with stove, plumbing, steering and Sado glass. Works are being carried out on deck gear, and electrical appliances. Boat is currently on schedule.

Production Update – Fitout 1

The installation of all Lewmar hatches, trampoline, fwd opening windows, galley benchtops, bulkheads Laminex, and window liners is 100% completed. We are currently installing deck gear, hartop nonskid repair, bunk headliner surround, steering, electric (75% done), and just started with the plumbing work. Inboard engines will soon be installed.

Production Update – Fitout 2

Jobs have been completed on steering, deck gear, helm seats, Lewmar hatches, plumbing, helm windows, fwd opening windows, and benchtops. We are currently doing antifoul touch up, bunk headliners, and trifold door assembly. Electric works is about to be started.