Production Update – Assembly 1

The boat has now progressed to her first Assembly stage. Deck was moved to our Seawind shed on 12th November, and first handover check was done on the same day. Hull is currently stored at our warehouse in Navioil port in order to keep our driveway free for the moving of the Seawind 1600. Hull is planned to be transported back to the Seawind shed on Monday morning on 23rd November for the deck joining to begin.

Production Update – Fitout 2

Jobs have been completed on all windows, plumbing, headliners, galley, aircon, deck gear, and Flexiteak. We are currently working on door frames, joinery, electric installations (50% completed). Some critical parts will soon arrive for installation such as Mastervolt parts, hydro-generator parts and life raft.

Production Update – Assembly 2

This is a Seawind 1190 Lite which means she has a Seawind 1160 targa bar, interior and rigging. Deck joining took place as planned on 23rd November, 2020. We have just started with Assembly 2 works including carpet, trimming deck hatches, and trampoline installation. Boat is on time.

Production Update – Fitout 1

This is the first Seawind 1190 Sport with Inboard engines. Jobs have been completed on the helm seats, all Lewmar hatches installation, carpet, fwd opening windows, anchor, trampoline, and bulkhead Laminex. We are currently working on steering, deck gear, helm windows, starting plumbing and electrics.

Congratulations – Jakdec is on her way!

Your Seawind 1160 Lite has been completed, and is on her way to Brisbane. The boat is scheduled to arrive at Brisbane on 17th November, 2020. A quick tour of the boat can be viewed via this Youtube video.

It has been a pleasure building this boat for you and on behalf of the entire team at Seawind Catamarans we wish you many years of fun filled enjoyment aboard your new Seawind 1160 Lite.

Fair winds and following seas,