Hull is now in its final stage of Lamination with some final touching up before it is moved to our Seawind shed. Deck is completed with the Lamination. It is scheduled for both deck and hull to be moved to the Seawind shed on Monday 23rd November for the deck joining to begin.
Production Update – Assembly
Production Update – Assembly 2
Deck joining took place on 28th September. Jobs are now completed for the trampoline flange, cockpit drains, helm seats, rudder bearings, galley benchtop, window liners, and deck hatches installation. We are now working on plumbing (50% done), carpet, watermaker installation, Lewmar hatches, and starting with deck gear.
Production Update – Fitout 1
Production Update – Lamination
Production Update – Assembly 1
The boat has now progressed to her first Assembly stage. Deck was moved to our Seawind shed on 12th November, and first handover check was done on the same day. Hull is currently stored at our warehouse in Navioil port in order to keep our driveway free for the moving of the Seawind 1600. Hull is planned to be transported back to the Seawind shed on Monday morning on 23rd November for the deck joining to begin.
Production Update – Fitout 2
Jobs have been completed on all windows, plumbing, headliners, galley, aircon, deck gear, and Flexiteak. We are currently working on door frames, joinery, electric installations (50% completed). Some critical parts will soon arrive for installation such as Mastervolt parts, hydro-generator parts and life raft.
Production Update – Assembly 2
Production Update – Fitout 1
This is the first Seawind 1190 Sport with Inboard engines. Jobs have been completed on the helm seats, all Lewmar hatches installation, carpet, fwd opening windows, anchor, trampoline, and bulkhead Laminex. We are currently working on steering, deck gear, helm windows, starting plumbing and electrics.