Your boat has now entered the next stage – Assembly.
The deck joining took place on January 20th. At this stage, the deck-hull exterior joint has been completed and surface preparation of the joints is ongoing before gelcoat application. All interior laminations of deck before window liners have been completed and backplates have been installed below the deck.
Besides, there are a few critical parts that have recently been completed including the exhaust system, steering system, rudder, seawater filters engine and hoses.