Production Update – Assembly

Your boat has now entered the next stage – Assembly.

At this point, the starboard forward head, port and starboard forward cabin, locker interior separation, engine beds, centre furniture and port aft head furniture have been glassed. Also, the starboard head’s ceiling liner and the fuel tanks have been assembled.

We’re now working on the rudder shaft and engine installation.