Your boat is progressing well in the Assembly stage.
Your boat has been moved to main production line for assembly 3 stage. Fuel tanks were installed. The deck has targa bar and roof on. Our Production team is working on deck drains, flowcoat works, steering conduits, and small composite parts. Hull-deck join will be started soon.