Posted on May 31, 2024May 31, 2024 by updatesProduction Update – Assembly Your boat has already entered the new stage after lamination – assembly. At this ASSY-1 stage, the targa bar, roof and stanchions have been installed. Currently, we’re doing final preparation for deck joining and painting the blacks.