Production Update – Assembly

Your boat has now entered the next stage after lamination – Assembly.

Both hull and deck have been handed over to the Seawind Assembly team since November 18th. The deck joining took place on November 21st. At this point, we have done with drilling thru-hulls, bulkheads, targa bench insert, laminate bulkheads, Lewmar side hatches, and chainplates.

Currently, we are working on composite deck hatches, starting with deck gear, doing window liners, fitting interior composite parts.