Your boat is now moving on to a new stage – Assembly.
At this point, engines are installed. The main deck has trifold door bulkhead installed with the helm seat and console. As per our plan, the coach roof assembly will be started after TET.
Your boat is now moving on to a new stage – Assembly.
At this point, engines are installed. The main deck has trifold door bulkhead installed with the helm seat and console. As per our plan, the coach roof assembly will be started after TET.