Production Update – Assembly

Your boat is now moving on to a new stage – Assembly.

As you will see, the coach roof now has window surround attached and both salon and cockpit ceiling grids installed. Besides that, The Targa bar was handed over to the assembly team and we are preparing it for joining and installation to the boat.

After TET we will install the Targa bar and coach roof to the main deck and then join the deck to the hull.