Production Update – Assembly

Your boat has now entered the next stage after Lamination – Assembly.

Deck joining took place on February 8th as per schedule. At this point, we have done with deck joining, engine pods, and flow coating.

Currently, we are working on transom extension gelcoat repair, and forward beam/bow joint gelcoat repair.