Production Update – Assembly

We are excited to inform you that your SC574 is now in Assembly stage.

Detailing jobs for transom steps and cockpit seat are finished. The bulkhead in port mid-ship was also installed. Our Assembly Team also trimmed the port side head, hatch lids, bulkhead inside fuel locker. Bunk cleat and bunk base were also on the boat.

At the moment, the team is installing the water unit for the cockpit tank, cutting the toilet cover and door wall.