Your boat has entered the Detailing and QA stage.
At this point, we have done with other main tasks related to antifouling, trifold door, all windows and hatches, solar panels, deck gear, all flooring bunk liners, and steering.
We are working on timber fitout (50% done), helm station, and electric installations (50%).