Production Update – Fit out

Your boat has been entering the Fitout 3 stage with a few more completed components.

Until now, the team has assembled the longeron and all interior window liners. Fresh water, seawater, grey water discharge pumps and bilge pumps have been installed. On the electrical part, the batteries, chargers, switch panel, and Czone installations have also been completed. The electrical assembly and wiring have just started.

The production team is currently working on the steering system, Targa bar, and trifold doors.