Production Update – Fit out 2

Your boat is doing well moving forward to the fit out 2 stage.

We have done with antifouling, all windows are installed (and curing), deck gear, solar panels, all flooring, and freezer are in place.

Currently, we are working on steering, Webasto hot water system and about to install genset underneath the port aft bank.